Professional Roofing Platform

Measure Roofs with Satellite Precision

Access live satellite imagery, draw shapes to measure roofs and buildings, manage projects across your organization — all in one powerful platform.

From $20/user/mo 7-day free trial Cancel anytime
Aerial satellite view of a modern house roof — RoofMate satellite roof measurement

99.9%

Uptime

50K+

Measurements

500+

Projects

24/7

Support

Features

Everything you need to measure, plan and quote

From satellite imagery to live cadastre overlays, RoofMate gives you the tools to measure, plan and report — without leaving the browser.

Trusted by 50+ roofing teams across NSW, VIC & QLD

Analytics dashboard

See your team’s output at a glance

Track total measurements, area mapped and shape distribution across projects. Filter by team member, time range or shape type. Export the underlying data or share project-level PDF reports with clients in one click.

Map workspace

Draw, measure and label — directly on satellite imagery

A full measurement workspace on top of live satellite imagery — twelve drawing tools, on-shape area & perimeter labels, a precise properties panel for every shape, and a Shapes drawer that lists everything you’ve drawn at a glance. Built so estimators can quote a roof in minutes, not hours.

Australian cadastre overlay

Property boundaries from every Australian state — built in

Toggle official lot boundaries from NSW, VIC, QLD, WA, SA, TAS, NT and ACT spatial services. Outlines stay crisp at every zoom level thanks to on-canvas edge processing, with an adjustable opacity wash for context.

Site planning

Plan crane lifts, offices, storage and amenities pre-arrival

Drop Crane, Site Office, Storage, Toilet and Skip Bin markers. Built for pre-job toolbox talks and traffic management plans. The Site Logistics tab keeps planning data separate from measurements.

Historical satellite imagery — Pro & Enterprise

Pick a satellite date and lock it to the project

Inside the map workspace, hit the new Date ▾ pill next to the Satellite / Hybrid / Roadmap buttons and pick any of ~194 Esri Wayback snapshots from 2014 to today. The base imagery swaps in place, the choice is saved per project, and your drawn shapes, cadastre overlay and measurements all stay rendered on top. Open the same project tomorrow and the imagery is exactly where you left it. Available on Pro and Enterprise plans.

Time Travel

Compare the property today vs years ago — with Swipe & Timeline

Toggle between Swipe (drag a vertical divider across two dates) and Timeline (scrub through every Wayback snapshot between the chosen dates) with one click. A floating date bubble follows the slider, ◀ / ▶ steppers jump between releases, and the ▶ Play button auto-advances the time-lapse. Sync snaps both views back to the property. Powered by 193 Esri World Imagery Wayback snapshots from 2014 to present — perfect for storm-damage claims, before/after reporting and council submissions.

View modes — free for everyone

2D, 45° bird’s-eye and 360° Street View — switch in one click

Right next to the SATELLITE / HYBRID / ROADMAP buttons you’ll find a new 2D / 45° / 360° pill. 2D locks the map top-down for precise drawing; 45° tilts to Google’s bird’s-eye oblique imagery — best for assessing roof pitch, chimneys and dormers; 360° opens a full Street View panorama at the property so you can inspect driveways, front-of-house access and neighbouring buildings before you quote. All three modes work in both the full Project workspace and the Quick Look address inspector. No upgrade required — free on every plan.

Pricing

Simple, Transparent Pricing

Choose the plan that fits your team. Upgrade or downgrade anytime.

7-day free trial Cancel anytime

Basic

$20/user/month
Unlimited Projects, 5 Users
  • Basic map tools
  • Email support
Most Popular

Pro

$35/user/month
Unlimited Projects, 25 Users
  • All drawing tools
  • Priority support
  • Project sharing
  • Analytics

Enterprise

$50/user/month
Unlimited Projects, Unlimited Users
  • All features
  • Historical imagery compare (Time Travel)
  • Dedicated support
  • Custom integrations
  • SLA guarantee
Compare Plans

Features by plan

Every plan includes the core drawing tools. Pro adds advanced measurement, Enterprise unlocks site logistics and cadastre boundaries.

FeatureBasicProEnterprise
Drawing & basics
Address search & satellite map
Markers and text labels
Polygon / Rectangle / Circle / Line
Arrow annotations
Area and distance measurement
Snapshot & PDF export
Advanced measurement
Perimeter tool—
Multi-distance tool—
Height estimation (shadow)—
Angle measurement—
Historical satellite imagery (Wayback ~194 dates)—
Project & team
Save projects
Project sharing with team—
Team members & roles5 users25 usersUnlimited
Analytics dashboards—
Audit log—
Priority email support—
Site planning (Enterprise)
Site logistics markers (Crane, Office, Storage, Toilet, Skip)——
Cadastre property boundaries (AU)——
Time Travel — Swipe two dates——
Time Travel — Timeline scrub & ▶ Play——
SLA & dedicated support——

All plans include a 7-day free trial. Upgrade or downgrade anytime.

How It Works

Get Started in 3 Simple Steps

01

Sign Up & Create

Register your organization, choose a plan, and set up your team in minutes.

02

Draw & Measure

Search any address, use 12+ drawing tools. Area, distance, angles and height auto-calculate.

03

Export & Share

Download imagery, share projects with your team, invite users, and generate reports.

FAQ

Frequently asked questions

Everything you need to know about RoofMate. Can't find an answer? Get in touch.

Ready to Start Measuring?

Join hundreds of roofing professionals using RoofMate for satellite measurement, project management, and team collaboration.

7-day free trial · Cancel anytime

Contact

Get in touch with our team

Questions, partnerships, or custom plans — we usually reply within 1 business day.

Send us a note about pricing, demos, integrations, or anything else.

Already a customer?

Existing tenants can open a support ticket directly from inside the app — your AI assistant will try to answer instantly.

By submitting, you agree to be contacted by RoofMate.